Back to the Start About WM Diagnostics About Air Pressure Testing About SAP Assesments Contact Us E1 Sound Tests & Accreditation Previous Contracts The British Institute of Non-Destructive Testing's Website Recycle Now The Energy Savings Trust The Carbon Trust
Previous Major/Minor Contracts
Please find below a list of previous Contracts carried out by WM Diagnostics
Client details are not discolsed in accordance with the data protection act 1998
 

Loscombe Road, Phase 1
Loscombe Road, Phase 2

A Large development consisting of dwellings designed for local needs.

 
Westward Ho!, Phase 1
Westward Ho!, Phase 2
Westward Ho!, Phase 3
Westward Ho!, Phase 4


A Large development consisting of both local needs and private dwellings.
   
Tiverton Development
Barnstaple Development

Two large developments of local needs dwellings. totaling 14 tests carried out over 2 days.
 

Sandy Lane
Exeter Street, Phase 1
Exeter Street, Phase 2

One minor development and one large development in two stages carried out by a national developer. The small development consisted of quality private dwellings, while the second consited of local needs and private dwellings.

 
St Keverne, Cornwall
St Agnes, Cornwall

Two large developments of local needs houses in the area around Redruth.
 
Trevine Meadows, Phase 1

An ongoing development by a local builder to increase the number of local needs dwellings in and around St Austell.
 
Kelly Bray Development

A small development of several dwellings built for local needs. This development consisted of several small builders and developers.
 
There have also been more than 60 small developers and self builds.
Many of these small developers have taken advantage of our discounted rates (SAP Assessments and Pressure Tests)